
Objective
Restore reliable production and bring the press up to today’s safety state of the art with an operator-friendly concept and audit-ready documentation (EN/DE)—at a fraction of the cost of a new machine.
Scope (before/after)
- Before: age-ing control, recurring faults/downtime; safeguarding partly outdated.
- After (retrofit): new safety control system (PL/SIL path defined), revised operating concept, adapted safeguards, validation & acceptance with documentation.


What we did
- Assessment & concept
- Condition check (hydraulics, electrics, safeguarding, operator workflow).
- Safety concept incl. PL/SIL allocation and ISO 13855 distance evidence.
- Control system replacement
- New safety control system with clear diagnostics and documented release logic.
- Wiring refresh and tidy cabinet layout; labelled components.
- Safeguarding
- Review/adjust light curtain or multi-beam AOPD (as applicable); rear/under-reach checks.
- Guard doors/interlocks per anti-tamper principles; restart prevention.
- Operating concept
- Clean modes (set-up / single stroke / automatic), two-hand/enable logic, clear signalling.
- Validation & acceptance
- Functional tests and (where needed) stop-time measurements; ISO 13855 distance calculations.
- Acceptance protocol and audit-ready documentation (EN/DE).


Results
- Fast, stable production with clear diagnostics.
- Higher safety (documented PL/SIL pathway; distances per ISO 13855).
- Lower total cost vs. new machine; the press frame remains the longest-lasting part.
- Audit-ready evidence for internal/external reviews.
Standards & evidence
ISO 13849-1 · IEC 62061 · ISO 13855/13857 · IEC 61496 (AOPD) · IEC 60204-1 · ISO 16092 (presses)
Deliverables
- Concept & action list (priorities, owners, timelines)
- Cabinet documentation & updated schematics (PDF)
- Validation plan, test records, acceptance report (EN/DE)
- Label (date & next interval) + short operator/maintenance briefing
Related projects
- Hydraulic press – Müller Weingarten 250 t – full retrofit: hydraulics, cabinet, operating concept → equivalent to a new machine.
- Eccentric press – robot cell – contactor logic → safety control system, new releases → downtime −18%.
